Hypothetical Integration of High Speed Rail Between Phoenix and Tucson

Description
The Phoenix-Metro area currently has problems with its transportation systems. Over-crowded and congested freeways have slowed travel times within the area. Express bus transportation and the existence of "High Occupancy" lanes have failed to solve the congestion problem. The light

The Phoenix-Metro area currently has problems with its transportation systems. Over-crowded and congested freeways have slowed travel times within the area. Express bus transportation and the existence of "High Occupancy" lanes have failed to solve the congestion problem. The light rail system is limited to those within a certain distance from the line, and even the light rail is either too slow or too infrequent for a commuter to utilize it effectively. To add to the issue, Phoenix is continuing to expand outward instead of increasing population density within the city, therefore increasing the time it takes to travel to downtown Phoenix, which is the center of economic activity. The people of Phoenix and its surrounding areas are finding that driving themselves to work is just as cost-effective and less time consuming than taking public transportation. Phoenix needs a cost-effective solution to work in co- existence with improvements in local public transportation that will allow citizens to travel to their destination in just as much time, or less time, than travelling by personal vehicle.
Date Created
2012-12
Agent

Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects

154239-Thumbnail Image.png
Description
Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional

Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction projects is design-bid-build (DBB). The traditional DBB delivery system is a sequential low-integration process and can lead to inefficiencies and adverse relationships between stakeholders. Alternative project delivery methods (APDM) such as Construction Manager at Risk (CMAR) have been introduced to increase stakeholder integration and ultimately enhance project performance. CMAR project performance impacts have been studied in the horizontal and vertical construction industries. However, the performance of CMAR projects in the pipeline engineering and construction industry has not been quantitatively studied.

The dissertation fills this gap in knowledge by performing the first quantitative analysis of CMAR performance on pipeline engineering and construction projects. This study’s two research objectives are:

(1) Develop a CMAR baseline of commonly measured project performance metrics

(2) Statistically compare the cost and schedule performance of CMAR to that of the traditional DBB delivery method

A thorough literature review led to the development of a data collection survey used in conjunction with structured interviews to gather qualitative and quantitative performance data from 66 completed water and wastewater pipeline projects. Performance data analysis was conducted to provide performance benchmarks for CMAR projects and to compare the performance of CMAR and DBB.

This study provides the first CMAR performance benchmark for pipeline engineering and construction projects. The results span across seven metrics in four performance areas (cost, schedule, project change, and communication). Pipeline projects delivered using CMAR have a median cost and schedule growth of -5% and 5.10%, respectively. These results are significantly improved from DBB baseline performance shown in other industries. To verify this, a statistical analysis was done to compare the cost and schedule performance of CMAR to similar DBB pipeline projects. The results show that CMAR pipeline projects are being delivered with 6.5% less cost growth and with 12.5% less schedule growth than similar DBB projects, providing owners with increased certainty when delivering their pipeline projects.
Date Created
2015
Agent

The development and engineering application of a fiber reinforced hybrid matrix composite for structural retrofitting and damage mitigation

152364-Thumbnail Image.png
Description
Civil infrastructures are susceptible to damage under the events of natural or manmade disasters. Over the last two decades, the use of emerging engineering materials, such as the fiber-reinforced plastics (FRPs), in structural retrofitting have gained significant popularity. However, due

Civil infrastructures are susceptible to damage under the events of natural or manmade disasters. Over the last two decades, the use of emerging engineering materials, such as the fiber-reinforced plastics (FRPs), in structural retrofitting have gained significant popularity. However, due to their inherent brittleness and lack of energy dissipation, undesirable failure modes of the FRP-retrofitted systems, such as sudden laminate fracture and debonding, have been frequently observed. In this light, a Carbon-fiber reinforced Hybrid-polymeric Matrix Composite (or CHMC) was developed to provide a superior, yet affordable, solution for infrastructure damage mitigation and protection. The microstructural and micromechanical characteristics of the CHMC was investigated using scanning electron microscopy (SEM) and nanoindentation technique. The mechanical performance, such as damping, was identified using free and forced vibration tests. A simplified analytical model based on micromechanics was developed to predict the laminate stiffness using the modulus profile tested by the nanoindentation. The prediction results were verified by the flexural modulus calculated from the vibration tests. The feasibility of using CHMC to retrofit damaged structural systems was investigated via a series of structural component level tests. The effectiveness of using CHMC versus conventional carbon-fiber reinforced epoxy (CF/ epoxy) to retrofit notch damaged steel beams were tested. The comparison of the test results indicated the superior deformation capacity of the CHMC retrofitted beams. The full field strain distributions near the critical notch tip region were experimentally determined by the digital imaging correlation (DIC), and the results matched well with the finite element analysis (FEA) results. In the second series of tests, the application of CHMC was expanded to retrofit the full-scale fatigue-damaged concrete-encased steel (or SRC) girders. Similar to the notched steel beam tests, the CHMC retrofitted SRC girders exhibited substantially better post-peak load ductility than that of CF/ epoxy retrofitted girder. Lastly, a quasi-static push over test on the CHMC retrofitted reinforced concrete shear wall further highlighted the CHMC's capability of enhancing the deformation and energy dissipating potential of the damaged civil infrastructure systems. Analytical and numerical models were developed to assist the retrofitting design using the newly developed CHMC material.
Date Created
2013
Agent

Characterizing generation mix and virtual water for resilience to drought on the western U.S. power grid

152058-Thumbnail Image.png
Description
There is growing concern over the future availability of water for electricity generation. Because of a rapidly growing population coupled with an arid climate, the Western United States faces a particularly acute water/energy challenge, as installation of new electricity capacity

There is growing concern over the future availability of water for electricity generation. Because of a rapidly growing population coupled with an arid climate, the Western United States faces a particularly acute water/energy challenge, as installation of new electricity capacity is expected to be required in the areas with the most limited water availability. Electricity trading is anticipated to be an important strategy for avoiding further local water stress, especially during drought and in the areas with the most rapidly growing populations. Transfers of electricity imply transfers of "virtual water" - water required for the production of a product. Yet, as a result of sizable demand growth, there may not be excess capacity in the system to support trade as an adaptive response to long lasting drought. As the grid inevitably expands capacity due to higher demand, or adapts to anticipated climate change, capacity additions should be selected and sited to increase system resilience to drought. This paper explores the tradeoff between virtual water and local water/energy infrastructure development for the purpose of enhancing the Western US power grid's resilience to drought. A simple linear model is developed that estimates the economically optimal configuration of the Western US power grid given water constraints. The model indicates that natural gas combined cycle power plants combined with increased interstate trade in power and virtual water provide the greatest opportunity for cost effective and water efficient grid expansion. Such expansion, as well as drought conditions, may shift and increase virtual water trade patterns, as states with ample water resources and a competitive advantage in developing power sources become net exporters, and states with limited water or higher costs become importers.
Date Created
2013
Agent

Post-installation of high density polyethylene pipe submerged in saturated silty soils

151085-Thumbnail Image.png
Description
The thesis examines how high density polyethylene (HDPE) pipe installed by horizontal directional drilling (HDD) and traditional open trench (OT) construction techniques behave differently in saturated soil conditions typical of river crossings. Design fundamentals for depth of cover are analogous

The thesis examines how high density polyethylene (HDPE) pipe installed by horizontal directional drilling (HDD) and traditional open trench (OT) construction techniques behave differently in saturated soil conditions typical of river crossings. Design fundamentals for depth of cover are analogous between HDD and OT; however, how the product pipe is situated in the soil medium is vastly different. This distinction in pipe bedding can produce significant differences in the post installation phase. The research was inspired by several incidents involving plastic pipe installed beneath rivers by HDD where the pipeline penetrated the overburden soil and floated to the surface after installation. It was hypothesized that pipes installed by HDD have a larger effective volume due to the presence of low permeability bentonite based drilling fluids in the annular space on completion of the installation. This increased effective volume of the pipe increases the buoyant force of the pipe compared to the same product diameter installed by OT methods, especially in situations where the pipe is installed below the ground water table. To simulate these conditions, a real-scale experiment was constructed to model the behavior of buried pipelines submerged in saturated silty soils. A full factorial design was developed to analyze scenarios with pipe diameters of 50, 75, and 100 mm installed at varying depths in a silty soil simulating an alluvial deposition. Contrary to the experimental hypothesis, pipes installed by OT required a greater depth of cover to prevent pipe floatation than similarly sized pipe installed by HDD. The results suggested that pipes installed by HDD are better suited to survive changing depths of cover. In addition, finite element method (FEM) modeling was conducted to understand soil stress patterns in the soil overburden post-installation. Maximum soil stresses occurring in the soil overburden between post-OT and HDD installation scenarios were compared to understand the pattern of total soil stress incurred by the two construction methods. The results of the analysis showed that OT installation methods triggered a greater total soil stress than HDD installation methods. The annular space in HDD resulted in less soil stress occurring in the soil overburden. Furthermore, the diameter of the HDD annular space influenced the soil stress that occurred in the soil overburden, while the density of drilling fluids did not vastly affect soil stress variations. Thus, the diameter of the annular space could impact soil stress patterns in HDD installations post-construction. With these findings engineers and designers may plan, design, and construct more efficient river-crossing projects.
Date Created
2012
Agent

Utilization of metaheuristic methods in the holistic optimization of municipal right of way infrastructure management

150719-Thumbnail Image.png
Description
This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning

This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure components that are typically owned and operated under the same municipal umbrella: roads, sewer, and water. The traditional paradigm for the planning of right way asset management involves operating in silos where there is little collaboration amongst different utility departments in the planning of maintenance, rehabilitation, and renewal projects. By collaborating across utilities during the planning phase, savings can be achieved when collocated rehabilitation projects from different right of way infrastructure components are synchronized to occur at the same time. These savings are in the form of shared overhead and mobilization costs, and roadway projects providing open space for subsurface utilities. Individual component models and a holistic model that utilize evolutionary algorithms to optimize five year maintenance, rehabilitation, and renewal plans for the road, sewer, and water components were created and compared. The models were designed to be portable so that they could be used with any infrastructure condition rating, deterioration modeling, and criticality assessment systems that might already be in place with a municipality. The models attempt to minimize the overall component score, which is a function of the criticality and condition of the segments within each network, by prescribing asset management activities to different segments within a component network while subject to a constraining budget. The individual models were designed to represent the traditional decision making paradigm and were compared to the holistic model. In testing at three different budget levels, the holistic model outperformed the individual models in the ability to generate five year plans that optimized prescribed maintenance, rehabilitation and renewal for various segments in order to achieve the goal of improving the component score. The methodology also achieved the goal of being portable, in that it is compatible with any condition rating, deterioration, and criticality system.
Date Created
2012
Agent

Development of the project definition rating index (PDRI) for infrastructure projects

149457-Thumbnail Image.png
Description
Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns,

Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This thesis describes a novel and effective risk management tool that has been developed by the Construction Industry Institute (CII) called the Project Definition Rating Index (PDRI) for infrastructure projects. Input from industry professionals from over 30 companies was used in the tool development which is specifically focused on FEP. Data from actual projects are given showing the efficacy of the tool. Critical success factors for FEP of infrastructure projects are shared. The research shows that a finite and specific list of issues related to scope definition of infrastructure projects can be developed. The thesis also concludes that the PDRI score indicates the current level of scope definition and corresponds to project performance. Infrastructure projects with low PDRI scores outperform projects with high PDRI scores.
Date Created