Post occupancy performance evaluation of "time of installation" factors-- a seven year study of SPF roofing

152185-Thumbnail Image.png
Description
Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the

Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e. Sprayed Polyurethane Foam Roofs (SPF roofs). Thirty seven urethane coated SPF roofs that were installed in 2005 / 2006 were visually inspected to measure the percentage of blisters and repairs three times over a period of 4 year, 6 year and 7 year marks. A repairing criteria was established after a 6 year mark based on the data that were reported to contractors as vulnerable roofs. Furthermore, the relation between four possible contributing time of installation factors i.e. contractor, demographics, season, and difficulty (number of penetrations and size of the roof in square feet) that could affect the quality of the roof was determined. Demographics and difficulty did not affect the quality of the roofs whereas the contractor and the season when the roof was installed did affect the quality of the roofs.
Date Created
2013
Agent

Implementation of the best value approach in India

152178-Thumbnail Image.png
Description
The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired to as well as bring added value. The problems faced by the Indian construction industry are very similar to those faced by other developing countries. The objective of this paper is to discuss and analyze the economic concerns, inefficiencies and investigate a model that both explains the Indian construction industry structure and provides a framework to improve efficiencies. The Best Value (BV) model is examined as an approach to be adopted in lieu of the traditional approach. This could result in efficient construction projects by minimizing cost overruns and delays, which until now have been a rarity.
Date Created
2013
Agent

Experimentation of managerial techniques for the optimization of a voluntary construction workforce

151681-Thumbnail Image.png
Description
Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood

Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to test the areas of Time, Waste, Quality, Safety, and Satisfaction of different volunteer groups. The challenge was bolstered by giving the teams no power tools and limited available resources. A simple design of experiment model was used to test highs and lows in the three management techniques of Instruction, Help, and Encouragement. Each scenario was tested multiple times. Data was collected, normalized and analyzed using statistical analysis software. A few significant findings were discovered. The first; the research showed that there was no significant correlation between the management practices of the leader and the satisfaction of the volunteers. The second; the research also showed when further analyzed into specific realistic scenarios that the organizations would be better to focus on high amounts of Help and Encouragement in order to maximize the productivity of their volunteer construction workforce. This is significant as it allows NPO's and governments to focus their attention where best suited to produce results. The results were shared and the study was further validated as "significant" by conducting interviews with experts in the construction nonprofit sector.
Date Created
2013
Agent

Is there balance in business process management?

151441-Thumbnail Image.png
Description
ABSTRACT There has been plenty written on the topic of process management in business. This study focuses more on the need to research and develop a model to establish "balance" in process. Reengineering process and investing capital into current technology

ABSTRACT There has been plenty written on the topic of process management in business. This study focuses more on the need to research and develop a model to establish "balance" in process. Reengineering process and investing capital into current technology does not improve the outcome of process alone. The actual process activity coupled with human interface combined with technology determines the outcome of processes, however they do not indicate whether it is a balanced process or not. Wherein the word balance really means sustainable for long periods of time and easily reproduced by others. This study argues for the need of new research in the topic matter and its affects on company profitability, sustainability over long periods of time and tenure with employee.
Date Created
2012
Agent

Project management skills of the future

151282-Thumbnail Image.png
Description
The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped

The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving technology, and changing organizational structures. The future PM will respond to these emerging challenges using a combination of fourteen competencies. The competencies are grouped into four categories: technical (multi-disciplined, practical understanding of technology), management (keen business insight, understanding of project management, knowledge network building, continuous risk monitoring), cognitive (complex decisions making, emotional maturity, effective communication), and leadership (leveraging diverse thinking, building relationships, engaging others, mentoring, building trust). Popular data collection methods used in project management research, such as surveys and interviews, have received criticism about the differences between stated responses to questions, what respondents say they will do, and revealed preferences, what they actually practice in the workplace. Rather than relying on surveys, this research study utilized information generated from games and exercises bundled into one-day training seminars conducted by Construction Industry Institute (CII) companies for current and upcoming generations of PMs. Educational games and exercises provide participants with the opportunity to apply classroom learning and workplace experience to resolve issues presented in real-world scenarios, providing responses that are more closely aligned with the actual decisions and activities occurring on projects. The future competencies were identified by combining results of the literature review with information from the games and exercises through an iterative cycle of data mining, analysis, and consolidation review sessions with CII members. This competency forecast will be used as a basis for company recruiting and to create tools for professional development programs and project management education at the university level. In addition to the competency forecast, the research identified simulation games and exercises as components of a project management development program in a classroom setting. An instrument that links the emerging challenges with the fourteen competencies and learning tools that facilitate the mastering of these competencies has also been developed.
Date Created
2012
Agent

Predictive equipment failure methodology with sustainable change

151237-Thumbnail Image.png
Description
This dissertation examines an analytical methodology that considers predictive maintenance on industrial facilities equipment to exceed world class availability standards with greater understanding for organizational participation impacts. The research for this study was performed at one of the world's largest

This dissertation examines an analytical methodology that considers predictive maintenance on industrial facilities equipment to exceed world class availability standards with greater understanding for organizational participation impacts. The research for this study was performed at one of the world's largest semiconductor facilities, with the intent of understanding one possible cause for a noticeable behavior in technical work routines. Semiconductor manufacturing disruption poses significant potential revenue loss on a scale easily quantified in millions of dollars per hour. These instances are commonly referred to as "Interruption to production" (ITP). ITP is a standardized metric used across Company ABC's worldwide factory network to track frequency of occurrence and duration of manufacturing downtime. ITP, the key quantifiable indicator in this dissertation, will be the primary analytical measurement to identify the effectiveness of maintenance personnel's work routines as they relate to unscheduled downtime with facilities systems. This dissertation examines the process used to obtain change in an industrial facilities organization and the associated reactions of individual organizational members. To give the reader background orientation on the methodology for testing, measuring and ultimately assessing the benefits and risks associated with integrating a predictive equipment failure methodology, this dissertation will examine analytical findings associated with the statement of purpose as it pertains to ITP reduction. However, the focus will be the exploration of behavioral findings within the organization and the development of an improved industry standard for predictive ITP reduction process implementation. Specifically, findings associated with organizational participation and learning development trends found within the work group.
Date Created
2012
Agent

Consistent management and leadership practices and the Kashiwagi Solution Model (KSM)

150449-Thumbnail Image.png
Description
Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and

Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and logically identifies consistent and inconsistent leadership and management criteria. The hypothesis proposed is that Information Measurement Theory (IMT) along with the Kashiwagi Solution Model (KSM) is a methodology than can differentiate between accurate and inaccurate principles the initial part of the study about authors in these areas show how information is conflictive, and also served to establish an initial baseline of recommended practices aligned with IMT. The one author that excels in comparison to the rest suits the "Initial Baseline Matrix from Deming" which composes the first model. The second model is denominated the "Full Extended KSM-Matrix" composed of all the LS characteristics found among all authors and IMT. Both models were tested-out for accuracy. The second part of the study was directed to evaluate the perception of individuals on these principles. Two different groups were evaluated, one group of people that had prior training and knowledge of IMT; another group of people without any knowledge of IMT. The results of the survey showed more confusion in the group of people without knowledge to IMT and improved consistency and less variation in the group of people with knowledge in IMT. The third part of the study, the analysis of case studies of success and failure, identified principles as contributors, and categorized them into LS/type "A" characteristics and RS/type "C" characteristics, by applying the KSM. The results validated the initial proposal and led to the conclusion that practices that fall into the LS side of the KSM will lead to success, while practices that fall into the RS of the KSM will lead to failure. The comparison and testing of both models indicated a dominant support of the IMT concepts as contributors to success; while the KSM model has a higher accuracy of prediction.
Date Created
2011
Agent

Leadership based accountability for facilities management

150133-Thumbnail Image.png
Description
ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of

ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of their organizations. This thesis will discuss the important and flexible use of measurement and leadership reports and the benefits of justifying the work required to maintain or upgrade a facility. The task is streamlined by invoking accountability to subject experts. The facility manager must trust in the ability of his or her work force to get the job done. However, with accountability comes increased risk. Even though accountability may not alleviate total control or cease reactionary actions, facility managers can develop key leadership based reports to reassign accountability and measure subject matter experts while simultaneously reducing reactionary actions leading to increased cost. Identifying and reassigning risk that are not controlled to subject matter experts is imperative for effective facility management leadership and allows facility managers to create an accurate and solid facility management plan, supports the organization's succession plan, and allows the organization to focus on key competencies.
Date Created
2011
Agent

Best value implementation program for contractors

149709-Thumbnail Image.png
Description
The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The price based/management and control paradigm has not worked. Clients

The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The price based/management and control paradigm has not worked. Clients have now been moving toward the best value environment (hire contractors who know what they are doing, who preplan, and manage and minimize risk and deviation.) Owners are trying to move from client direction and control to hiring an expert and allowing them to do the quality control/risk management. The movement of environments changes the paradigm for the contractors from a reactive to a proactive, from a bureaucratic
on-accountable to an accountable position, from a relationship based
on-measuring to a measuring entity, and to a contractor who manages and minimizes the risk that they do not control. Years of price based practices have caused poor quality and low performance in the construction industry. This research identifies what is a best value contractor or vendor, what factors make up a best value vendor, and the methodology to transform a vendor to a best value vendor. It will use deductive logic, a case study to confirm the logic and the proposed methodology.
Date Created
2011
Agent

A Six Sigma-based approach to leadership in energy and environmental design for existing buildings: operations and maintenance

149458-Thumbnail Image.png
Description
With increasing interest in sustainability and green building, organizations are implementing programs such as Leadership in Energy and Environmental Design for Existing Buildings: Operations and Maintenance (LEED-EB) in order to focus corporate sustainability goals on the operations of a facility

With increasing interest in sustainability and green building, organizations are implementing programs such as Leadership in Energy and Environmental Design for Existing Buildings: Operations and Maintenance (LEED-EB) in order to focus corporate sustainability goals on the operations of a facility and the practices of the building occupants. Green building programs help reduce the impact of a facility and bring about several environmental benefits including but not limited to energy conservation, water conservation and material conservation. In addition to various environmental benefits, green building programs can help companies become more efficient. The problem is that organizations are not always successful in their pursuits to achieve sustainability goals. It frequently take years to implement a program, and in many cases the goals for sustainability never come to fruition, when in the mean time resources are wasted, money is spent needlessly and opportunities are lost forever. This thesis addresses how the Six Sigma methodologies used by so many to implement change in their organizations could be applied to the LEED-EB program to help companies achieve sustainability results. A qualitative analysis of the Six Sigma methodologies was performed to determine if and how a LEED-EB program might utilize such methods. The two programs were found to be compatible and several areas for improvements to implementing a LEED-EB program were identified.
Date Created
2010
Agent