Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’

Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the study are: investigating the risks that are out of contractors’ control, assessing the contractors’ current risk mitigation and performance measurement practices, and finally developing and validating a risk mitigation model to minimize risks out of contractors’ control and measure performance of involved project parties. To achieve the study aim, a mixed methodological approach was adopted. Theoretical approaches were utilized to review previous research and to develop a conceptual risk mitigation framework followed by a practical approach that is considered with collecting data from contractors. The quantitative method was mainly used to meet the study objectives through distributing a survey in the form of a questionnaire. As a consolidation of the study findings, the top ranked risks that are out of contractors’ control were identified. Furthermore, the results identified that the contractors’ current risk management and performance measurement practices are not effective in minimizing projects risks caused by other parties and ineffective in measuring performance of all parties. The developed model focuses on increasing accountability of project parties through mitigating project parties’ activities and risks with measuring the deviations and identifying sources of deviations. Transparency is utilized in the model through sharing weekly updates of the activities and risks combined with updated information of performance measurements of all project parties. The study results showed that project risks can be minimized and projects’ performance can be increased if contractors shift their focus using the developed model from only managing their own activities and risks to managing all project parties’ activities and risks.
Reuse Permissions
  • Downloads
    PDF (1.7 MB)
    Download count: 3

    Details

    Title
    • Assessment and Development of Contractors’ Mitigation Practices Towards Risks out of Contractors’ Control in the Saudi Construction Industry
    Contributors
    Date Created
    2018
    Resource Type
  • Text
  • Collections this item is in
    Note
    • Doctoral Dissertation Construction Management 2018

    Machine-readable links