ABSTRACT
The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties worldwide and in Saudi Arabia, as well as to give recommendation according to the outcomes of this research. The causes of litigious behavior in Saudi Arabia and other countries around the world were identified and documented, also the differences in litigation of the Saudi Arabian construction industry as compared to other countries were identified. Preliminary investigations revealed that there are some level of similarity in the nature of the causes. Thus, these causes were grouped into three main categories which are expectation factors, communications factors and documentation factors. Further research based on existing literature showed that the practices used to minimize litigation in the construction industry were investigated. The following delivery process were researched: design-build (DB) delivery method, Alliance Contracting, Construction Manager at Risk (CMAR), Best Value Approach, Integrated Project Delivery (IPD), and Public-Private Partnerships (PPPs), and the PIPS/PIRMS approach. These delivery methods were found to have issues, which means the methods by observation do not seem to be the ideal solution to minimize litigation in the construction industry. The only delivery method found to have no litigation issues was the PIPS/PIRMS approach.
The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties worldwide and in Saudi Arabia, as well as to give recommendation according to the outcomes of this research. The causes of litigious behavior in Saudi Arabia and other countries around the world were identified and documented, also the differences in litigation of the Saudi Arabian construction industry as compared to other countries were identified. Preliminary investigations revealed that there are some level of similarity in the nature of the causes. Thus, these causes were grouped into three main categories which are expectation factors, communications factors and documentation factors. Further research based on existing literature showed that the practices used to minimize litigation in the construction industry were investigated. The following delivery process were researched: design-build (DB) delivery method, Alliance Contracting, Construction Manager at Risk (CMAR), Best Value Approach, Integrated Project Delivery (IPD), and Public-Private Partnerships (PPPs), and the PIPS/PIRMS approach. These delivery methods were found to have issues, which means the methods by observation do not seem to be the ideal solution to minimize litigation in the construction industry. The only delivery method found to have no litigation issues was the PIPS/PIRMS approach.
Download count: 8
Details
Title
- Causes of litigation in the Saudi Arabian construction Industry
Contributors
- Almutairi, Saud (Author)
- Kashiwagi, Dean (Thesis advisor)
- Sullivan, Kenneth (Committee member)
- Kashiwagi, Jacob (Committee member)
- Arizona State University (Publisher)
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
2015
Subjects
Resource Type
Collections this item is in
Note
- thesisPartial requirement for: M.S., Arizona State University, 2015
- bibliographyIncludes bibliographical references (pages 22-26)
- Field of study: Construction
Citation and reuse
Statement of Responsibility
by Saud Almutairi