The Water, Energy, & Infrastructure Co-Benefits of Smart Growth Planning in Phoenix

Description

Phoenix is the sixth most populated city in the United States and the 12th largest metropolitan area by population, with about 4.4 million people. As the region continues to grow, the demand for housing and jobs within the metropolitan area

Phoenix is the sixth most populated city in the United States and the 12th largest metropolitan area by population, with about 4.4 million people. As the region continues to grow, the demand for housing and jobs within the metropolitan area is projected to rise under uncertain climate conditions.

Undergraduate and graduate students from Engineering, Sustainability, and Urban Planning in ASU’s Urban Infrastructure Anatomy and Sustainable Development course evaluated the water, energy, and infrastructure changes that result from smart growth in Phoenix, Arizona. The Maricopa Association of Government's Sustainable Transportation and Land Use Integration Study identified a market for 485,000 residential dwelling units in the urban core. Household water and energy use changes, changes in infrastructure needs, and financial and economic savings are assessed along with associated energy use and greenhouse gas emissions.

The course project has produced data on sustainable development in Phoenix and the findings will be made available through ASU’s Urban Sustainability Lab.

Agent

Environmental Life Cycle Assessment of San Francisco Bay Area Muni Light Rail and Rapid Transit with Wholesale and Renewable Electricity

Description

Results are available here

The environmental life cycle assessment of electric rail public transit modes requires an assessment of electricity generation mixes. The provision of electricity to a region does not usually adhere to geopolitical boundaries. Electricity is governed based

Results are available here

The environmental life cycle assessment of electric rail public transit modes requires an assessment of electricity generation mixes. The provision of electricity to a region does not usually adhere to geopolitical boundaries. Electricity is governed based on lowest cost marginal dispatch and reliability principles. Additionally, there are times when a public transit agency may purchase wholesale electricity from a particular service provider. Such is the case with electric rail modes in the San Francisco Bay Area.

An environmental life cycle assessment of San Francisco Bay Area public transit systems was developed by Chester and Horvath (2009) and includes vehicle manufacturing/maintenance, infrastructure construction/operation/maintenance, energy production, and supply chains, in addition to vehicle propulsion. For electric rail modes, vehicle propulsion was based on an average electricity mix for the region. Since 2009, new electricity contract information and renewable electricity goals have been established. As such, updated life cycle results should be produced.

Using recent wholesale electricity mix and renewable electricity goal data from the transit agencies, updated electricity precombustion, generation, transmission, and distribution environmental impacts of vehicle propulsion are estimated. In summary, SFMTA Muni light rail is currently purchasing 100% hydro electricity from the Hetch Hetchy region of California and the Bay Area Rapid Transit (BART) system is purchasing 22% natural gas, 9% coal, 2% nuclear, 66% hydro, and 1% other renewables from the Pacific Northwest . Furthermore, the BART system has set a goal of 20% renewables by 2016. Using the GREET1 2012 electricity pathway, a life cycle assessment of wholesale and renewable electricity generation for these systems is calculated.

Chester and Horvath (2009)

Human and Organizational Factors that Contributed to the US-Canadian August 2003 Electricity Grid Blackout

Description

The US-Canadian electricity grid is a network of providers and users that operate almost completely independently of one another. In August of 2003, First Energy’s (FE) Harding-Chamberlain transmission line near Akron, Ohio went offline starting a series of cascading failures

The US-Canadian electricity grid is a network of providers and users that operate almost completely independently of one another. In August of 2003, First Energy’s (FE) Harding-Chamberlain transmission line near Akron, Ohio went offline starting a series of cascading failures that eventually led to 8 US states and 1 Canadian province totaling nearly 50 million people without power. The failure of transmission lines are common occurrences relating to the inability to exactly predict the electricity demand at any time (as will be discussed later in this document). The inability to properly monitor and react across multiple organizations to the downed line was the true failure that led to the blackout. This outage not only left homes and businesses without power but paralyzed critical public services such as transportation networks and hospitals. The estimated cost of the outage is between 4 and 6 billion US dollars.

Policy Brief: Developing Safer Alternatives to Conventional Plastics and Supporting the Use of Reusable Products Can Reduce Harm to Health and the Environment

Description

Researchers at ASU have identified opportunities to reduce risk to human health and the environment by changing the composition and disposal practices of polymers. Although plastics have benefited society in innumerable ways, the resulting omnipresence of plastics in society has

Researchers at ASU have identified opportunities to reduce risk to human health and the environment by changing the composition and disposal practices of polymers. Although plastics have benefited society in innumerable ways, the resulting omnipresence of plastics in society has led to concerns about the hazards of constant, low-level exposure and the search for options for sustainable disposal.

The team used examples from public health and medicine-sectors that have particularly benefited from polymer applications, to highlight the benefits of using plastics in certain applications and to pinpoint opportunities for reducing risks from all plastics’ uses. These include phasing out polymers that contain components associated with negative health effects, diminishing the need to dispose of large quantities of plastic through reduction and reuse, and promoting and developing less harmful alternatives to conventional plastics.

For additional discussion please see the publication Plastics and Environmental Health: the Road Ahead available online here.

Metropolitan-Scale Building Infrastructure Environmental Life Cycle Assessment: Los Angeles’ Embedded Impacts

Description

Building energy assessment often focuses on the use of electricity and natural gas during the use phase of a structure while ignoring the energy investments necessary to construct the facility. This research develops a methodology for quantifying the “embedded” energy

Building energy assessment often focuses on the use of electricity and natural gas during the use phase of a structure while ignoring the energy investments necessary to construct the facility. This research develops a methodology for quantifying the “embedded” energy and greenhouse gases (GHG) in the building infrastructure of an entire metropolitan region. “Embedded” energy and GHGs refer to the energy necessary to manufacture materials and construct the infrastructure. Using these methods, a case study is developed for Los Angeles County.

Policy Brief: Infrastructure and Automobile Shifts: Positioning Transit to Reduce Life-Cycle Environmental Impacts for Urban Sustainability Goals

Description

Public transportation systems are often part of strategies to reduce urban environmental impacts from passenger transportation, yet comprehensive energy and environmental life-cycle measures, including upfront infrastructure effects and indirect and supply chain processes, are rarely considered. Using the new bus

Public transportation systems are often part of strategies to reduce urban environmental impacts from passenger transportation, yet comprehensive energy and environmental life-cycle measures, including upfront infrastructure effects and indirect and supply chain processes, are rarely considered. Using the new bus rapid transit and light rail lines in Los Angeles, near-term and long-term life-cycle impact assessments are developed, including consideration of reduced automobile travel. Energy consumption and emissions of greenhouse gases and criteria pollutants are assessed, as well the potential for smog and respiratory impacts.

Results show that life-cycle infrastructure, vehicle, and energy production components significantly increase the footprint of each mode (by 48–100% for energy and greenhouse gases, and up to 6200% for environmental impacts), and emerging technologies and renewable electricity standards will significantly reduce impacts. Life-cycle results are identified as either local (in Los Angeles) or remote, and show how the decision to build and operate a transit system in a city produces environmental impacts far outside of geopolitical boundaries. Ensuring shifts of between 20–30% of transit riders from automobiles will result in passenger transportation greenhouse gas reductions for the city, and the larger the shift, the quicker the payback, which should be considered for time-specific environmental goals.

Life-Cycle Greenhouse Gas Emissions and Costs of the Deployment of the Los Angeles Roadway Network

Description

An inter-temporal life cycle cost and greenhouse gas emissions assessment of the Los Angeles roadway network is developed to identify how construction decisions lead to embedded impacts and create an emergent behavior (vehicle miles traveled by users) in the long

An inter-temporal life cycle cost and greenhouse gas emissions assessment of the Los Angeles roadway network is developed to identify how construction decisions lead to embedded impacts and create an emergent behavior (vehicle miles traveled by users) in the long run.

A video of the growth of the network and additional information are available here.

Date Created
2013-04

Smart Growth Along the Proposed Phoenix Light Rail Expansion Lines Can Reduce Future Urban Energy Consumption and Environmental Impacts

Description

This report is the consolidated work of an interdisciplinary course project in CEE494/598, CON598, and SOS598, Urban Infrastructure Anatomy and Sustainable Development. In Fall 2012, the course at Arizona State University used sustainability research frameworks and life-cycle assessment methods to

This report is the consolidated work of an interdisciplinary course project in CEE494/598, CON598, and SOS598, Urban Infrastructure Anatomy and Sustainable Development. In Fall 2012, the course at Arizona State University used sustainability research frameworks and life-cycle assessment methods to evaluate the comprehensive benefits and costs when transit-oriented development is infilled along the proposed light rail transit line expansion. In each case, and in every variation of possible future scenarios, there were distinct life-cycle benefits from both developing in more dense urban structures and reducing automobile travel in the process.

Results from the report are superseded by our publication in Environmental Science and Technology.

Date Created
2012-12
Agent

Assessing the Potential for Reducing Life-Cycle Environmental Impacts through Transit Oriented Development Infill along Existing Light Rail in Phoenix

142-Thumbnail Image.png
Description

Study Background: Researchers at ASU have determined that significant energy and environmental benefits are possible in the Phoenix metro area over the next 60 years from transit-oriented development along the current Valley Metro light rail line. The team evaluated infill

Study Background: Researchers at ASU have determined that significant energy and environmental benefits are possible in the Phoenix metro area over the next 60 years from transit-oriented development along the current Valley Metro light rail line. The team evaluated infill densification outcomes when vacant lots and some dedicated surface parking lots are repurposed for residential development. Life cycle building (construction, use, and energy production) and transportation (manufacturing, operation, and energy production) changes were included and energy use and greenhouse gas emissions were evaluated in addition to the potential for respiratory impacts and smog formation. All light rail infill scenarios are compared against new single family home construction in outlying areas.

Overview of Results: In the most conservative scenario, the Phoenix area can place 2,200 homes near light rail and achieve 9-15% reductions in energy use and emissions. By allowing multi-family apartments to fill vacant lots, 12,000 new dwelling units can be infilled achieving a 28-42% reduction. When surface lots are developed in addition to vacant lots then multi-family apartment buildings around light rail can deliver 30-46% energy and environmental reductions. These reductions occur even after new trains are put into operation to meet the increased demand.

Date Created
2013

Life Cycle Assessment of Ecosystem Services for Phoenix’s Building Stock

Description

Better methods are necessary to fully account for anthropogenic impacts on ecosystems and the essential services provided by ecosystems that sustain human life. Current methods for assessing sustainability, such as life cycle assessment (LCA), typically focus on easily quantifiable indicators

Better methods are necessary to fully account for anthropogenic impacts on ecosystems and the essential services provided by ecosystems that sustain human life. Current methods for assessing sustainability, such as life cycle assessment (LCA), typically focus on easily quantifiable indicators such as air emissions with no accounting for the essential ecosystem benefits that support human or industrial processes. For this reason, more comprehensive, transparent, and robust methods are necessary for holistic understanding of urban technosphere and ecosphere systems, including their interfaces. Incorporating ecosystem service indicators into LCA is an important step in spanning this knowledge gap.

For urban systems, many built environment processes have been investigated but need to be expanded with life cycle assessment for understanding ecosphere impacts. To pilot these new methods, a material inventory of the building infrastructure of Phoenix, Arizona can be coupled with LCA to gain perspective on the impacts assessment for built structures in Phoenix. This inventory will identify the origins of materials stocks, and the solid and air emissions waste associated with their raw material extraction, processing, and construction and identify key areas of future research necessary to fully account for ecosystem services in urban sustainability assessments. Based on this preliminary study, the ecosystem service impacts of metropolitan Phoenix stretch far beyond the county boundaries. A life cycle accounting of the Phoenix’s embedded building materials will inform policy and decision makers, assist with community education, and inform the urban sustainability community of consequences.