Full metadata
Title
An analysis of cost overrun in the construction industry
Description
This thesis presents a literature research analyzing the cost overrun of the construction industry worldwide, exploring documented causes for cost overrun, and documented parties responsible for the inefficiency. The analysis looks at a comparison between the metrics of construction projects in different continents and regions. Multiple publication databases were used to look into over 300 papers. It is shown that although construction demands are increasing, cost overrun on these projects is not decreasing at the same rate around the world. This thesis also presents a possible solution to improve cost overrun in the construction industry, through the use of the Best Value Performance Information Procurement System (BV PIPS). This is a system that has been utilized in various countries around the world, and has documented evidence that it may be able to alleviate the overrun occurring in the construction industry.
Date Created
2017
Contributors
- Goyal, Abhinav (Author)
- Kashiwagi, Jacob (Thesis advisor)
- Kashiwagi, Dean (Committee member)
- Chong, Oswald (Committee member)
- Arizona State University (Publisher)
Topical Subject
Resource Type
Extent
vi, 68 pages : color illustrations
Language
eng
Copyright Statement
In Copyright
Primary Member of
Peer-reviewed
No
Open Access
No
Handle
https://hdl.handle.net/2286/R.I.44148
Statement of Responsibility
by Abhinav Goyal
Description Source
Viewed on March 8, 2021
Level of coding
full
Note
thesis
Partial requirement for: M.S., Arizona State University, 2017
bibliography
Includes bibliographical references (pages 21-22)
Field of study: Construction
System Created
- 2017-06-01 01:52:27
System Modified
- 2021-08-26 09:47:01
- 3 years 3 months ago
Additional Formats